Everllence Logo
  • EN

Production site Berlin

World-class compression technology developed in Berlin.
At MAN Energy Solutions Berlin, 360 employees from 18 countries are responsible for the development, engineering, production and testing of high-tech integrally geared radial compression systems.
Our Berlin compression solutions are integral part to transform towards a sustainable industrial future and are used in Carbon Capture Utilization and Storage, Hydrogen as well as Heat pump applications.
We strives to transform energy into sustainable progress and prosperity for a climate-neutral future. #movingbigthingstozero
>
Scroll down

Gears and integrally geared compressors

Berlin is the center of excellence for integrally geared compressors.

The Product center combines the competencies for the engineering and the production of integrally geared compressors including the manufacturing of impellers and gear sets as well as the assembling and testing of gear boxes serving both the new equipment and PrimeServ business.

Technology innovation

MAN CCUS

The world’s industrial production needs to become carbon-neutral, fast. Avoidance, balancing, and capture are the three main carbon-reduction tactics. But not all three approaches are viable for all industrial producers. Carbon capture, utilization, and storage (CCUS) provides a proven and practical way of reducing emissions for large industrial plants in hard to abate sectors. MAN technology plays a key part in CCUS. 

Learn more

Heatpumps

Heat pumps are an important technology in the context of successful decarbonization of the heat supply for businesses and communities. Used in an industrial context, they not only save fuel costs, but can contribute to making a company’s heat supply carbon neutral and open up new business opportunities.

Learn more

Hydrogen

Hydrogen is a key element in the energy transition. It has the potential to decarbonize a vast variety of sectors, from shipping, heating and cooling to industrial applications. We at MAN Energy Solutions acknowledge the power of H2 and with our solutions and services, we are already covering all parts of the hydrogen economy today.

Learn more
Since more than
120
years based in Tegel
Up to
100
t
unit weights with tolerances <8µm
With more than
18
different nationalities just as diverse as Berlin

Technology and business activities in Berlin

Fully adaptable to your needs, our integrally geared compressors typically stand for high efficiency and a speedy return on investment in a wide range of applications. This multi-shaft centrifugal compressor allows for up to five pinions, depending on your individual requirements.

  •  Individually selectable impeller speed for optimal flow and costs
  • Up to three combined applications within one casing
  • Sealing and intercooling opportunities

Career and training offers

Address

MAN Energy Solutions Berlin

Egellsstr. 21
13507 Berlin
Germany

t +49 30 440402 0 

 

 

Site Manager Berlin - Dr. Sven Düsselmann

MAN Energy Solutions Berlin
Egellsstr. 21
13507 Berlin

sven.duesselmann@man-es.com

Head of Human Resources Berlin - Vera Rust

MAN Energy Solutions Berlin
Egellsstr. 21
13507 Berlin

vera.rust@man-es.com

Head of Sales CCS - Hans-Timon Singelmann

MAN Energy Solutions Berlin
Egellsstr. 21
13507 Berlin

hans-timon.singelmann@man-es.com

Head of Supply Chain Berlin - Dr. Sven Düsselmann

MAN Energy Solutions Berlin
Egellsstr. 21
13507 Berlin

sven.duesselmann@man-es.com


History

1857 – First BORSIG Compressor in Berlin

1977 – First BORISG Multi-Shaft Compressor designed in Berlin

1996 – Establishment of GHH BORSIG

1997 – World first 10stage CO2 integrally geared compressor supplied to customer 

2010  MAN Diesel and MAN Turbo merge to become MAN Diesel & Turbo

2018 – MAN Diesel & Turbo becomes MAN Energy Solutions SE

Learn more about our company history

Berlin Factory

News

Thursday, December 12, 2024

MAN Energy Solutions to Provide Compressor Technology for EGR/CCUS Project in Indonesia

MAN Energy Solutions to Provide Compressor Technology for EGR/CCUS Project in Indonesia

MAN Energy Solutions will supply three integrally geared compressors for bp’s Enhanced Gas Recovery (EGR) and Carbon Capture, Utilization, and Storage (CCUS) project at the Tangguh LNG plant in Papua Barat, Indonesia. This effort is part of Tangguh’s integrated Project UCC, which encompasses the Ubadari gas field development aimed at extending the gas feed to Tangguh’s three-train LNG operations.

MAN’s compressor trains will be located at an onshore facility, where CO2 will be compressed to a maximum of 165 bar. The UCC project is set to separate the reservoir CO2 from produced gas and reinject it for enhanced gas recovery and sequestration.

Dr. Marco Ernst, Head of Sales and Project Management CCS at MAN Energy Solutions, stated: “We are delighted to collaborate with bp on this significant project that supports Indonesia in meeting its carbon reduction targets and advancing its energy transition goals. CO2 emissions remain a challenge in LNG production, making CCUS solutions an essential part of the transition to a more sustainable energy future. With our advanced compressor technology, we draw on our extensive know-how and years of experience in CO2 compression to provide efficient and reliable solutions tailored to the demands of major projects like this one."

The scope of supply for Tangguh includes three multi-shaft integrally geared CO2 compressors, type RG90-8, each equipped with an electric motor and VFD starter, oil system, coolers and control cabinet. The solution also includes a dynamic process simulation, allowing the compressor system to operate at its fullest potential in terms of process efficiency.

The Tangguh project utilizes a modular compressor design specifically developed for CCUS applications, enabling a tailored approach to meet market demands. Lars Rosenow, Project Manager Sales at MAN Energy Solutions, explains: “Pre-designed compressor modules allow us to adapt our engineering more quickly and effectively to the specific project needs. This modular approach not only helps reduce CAPEX and OPEX but also ensures high operational efficiency. Additionally, it simplifies project implementation by reducing production and testing times and streamlining on-site installation.” 

Documents

  • Press-Release-TANGGUH_041224
    PDF, 317 KB English

Images

Contact

Roberto Rubichi

Trade Press Turbomachinery

Group Communications & MarketingEverllence Schweiz AGHardstrasse 319Zurich 8005

t +41 44 278 2211

Available languages

Explore more topics

MAN Energy Solutions is now Everllence.

We have adopted a new brand name and moved to a new domain: www.everllence.com. This page will also be relocated there shortly. We are working on shifting all pages to www.everllence.com.